MRVC with ICF
1MUMBAI, The Indian Economic Capital. And here the life runs and breathes by the local trains or the metro train in few ways to say. The new trains are efficient and dynamic. The new phase of MRVC needed new materials to counter cost and other parameters such as safety and vandalism.
2Engineering to the best using the fire retardant materials, such as plastics etc., fiber glass, aluminum to make the design better and composed.
33D engineering, Bill of Materials, Prototype in 1:1 was part of deliverance to the client.